Conceive. Adapt. Resolve. Evolve. 250-858-1464

info@evolveeng.ca

617 Government Street 3rd Floor Renovation

Project Description:

Client:
 Brookfield Global Integrated Solutions
Location:
 Douglas Building, Victoria, BC

A complete renovation of the 25,000sqft third floor office space was designed and constructed. The renovation was designed in accordance with the Province of BC’s SSBC Leading Workplace Requirements and Technical Standards. Services provided include design of power distribution, lighting, lighting controls, life safety, access control, intrusion, and communications. A retrofit of the main incoming service was required due to existing Canadian Electrical Code non-compliances, ageing infrastructure, and increased capacity required for future mechanical systems. The main 600V panelboard, transformer, ATS, and 208V panelboard were retrofitted in place and recertified. A coordination and arc flash study was performed for this equipment. The electrical shutdown for this work required coordination with multiple user groups and standby power was required for critical telecom equipment.